Step | | Procedure & Parts & Tools |
1 |
|
LOCATE THE CHARGER PLUG ON THE BACK OF THE MACHINE AND PULL TO DISCONNECT IT
|
2 |
|
LOCATE THE DRAIN HOSES ON THE BACK OF THE MACHINE AND DRAIN THE TANKS
|
3 |
|
REMOVE THE 5 SCREWS FROM THE CONTROL PANEL
Torx T25 |
|
|
4 |
|
PULL THE CABLE OUT OF THE DASH BOARD.
|
5 |
|
REMOVE THE 4 SCREWS OF THE BACK PANEL.
Torx T30 |
|
|
7 |
|
GRAB CABLE AT BACK OF MACHINE (BY THE VAC HOSE) AND PULL OUT OF TOP OF MACHINE. PUSH CABLE THRU TANK OPENING AT THE BACK OF THE MACHINE (BY THE VAC HOSE).
|
11 |
|
REMOVE THE 2 TANK BOLTS ON EACH SIDE OF THE MACHINE. THESE BOLTS ARE LOCATED AT THE FRONT OF THE MACHINE AT THE BASE.
Wrench-Allen metric 6.0mm |
|
|
12 |
|
LIFT THE TANK TO OPEN THE MACHINE
|
13 |
|
TRACE THE CABLE TO THE BATTERY COMPARTMENT AND CUT THE CABLE TIE. (NO NEED TO REMOVE THE BATTERIES, BATTERIES WERE REMOVED FOR PICTURE PURPOSES ONLY)
Wire cutters |
|
|
15 |
|
LOCATE THE BUNDLE OF WIRES AT THE POWER BOARD AT THE FRONT OF THE MACHINE.
|
16 |
|
LOCATE THE END OF THE COMMUNICATION CABLE THATS ATTACHED TO THE POWER BOARD AND PULL CABLE TO REMOVE IT FROM THE POWER BOARD.
|
17 |
|
REVERSE STEPS TO INSTALL A NEW COMMUNICATION CABLE.
|